The distance between the hot end nozzle and the hot bed in 0.1-0.2mm, follow below video leveling bed. You can email with fan photos to help you confirm. Make sure that the fan blades are not damaged and that there are no foreign objects. If still does not work, check the power indicator and the mainboard indicator (method: remove the bottom mainboard protective cover, refer to the video in the link below.) We make video tutorial about install steps, please follow:Ĭonfirm whether the input voltage range of the switching power supply is consistent with the electricity voltage in the area, and the screen cable is connected. If you find lost, please contact our technical team after confirm, we will resend new part to you.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
March 2023
Categories |